pvf coated auto brake pipe with fittings

Product Description

Technical Parameters

outer  diameter  (φ) wall thickness  tolerance(mm) wall thickness(mm) diameter tolerance (mm)   weight (g/m)   weight   Zinc(g/m) weight  PVF (g/m) resistance to pressure (Mpa) length(m/ton)
4.75(3/16″) +0.05 0.7  
 
 
±0.12 common And ± 0.08 Higher




 
70 71 72 88 13889
6 ±0.05 91 92 93 70 10753
6.35(1/4″) ±0.05 97 98 99 64 10101
8(5/16″) ±0.05 125 127 128 51 7813
9.52(3/8″) ±0.10 152 153 154 43 6494
10 ±0.10 160 162 163 41 6135
12 ±0.10 194 196 198 34 5051
8 ±0.05 1 172 174 175 72 5714
10 ±0.10 220 222 223 58 4484
12 ±0.10 270 272 274 48 3650
15 ±0.10 346 349 351 36 2849
Mechanical Property   Yield Strength 6s ≥180Mpa   
Elongation δ≥25% 
Tensile Strength 6s ≥290Mpa       
Test item  Flaring Test  / Bending Test /  Flattening Test /  Pressure Test / SalJt mist Test

Specification and performance of surface plated

Mark Type Typical Appearance Aiti-corrosion Time
A Copper Tube Bright or light blue 6-8h
B White Zinc Tube Rainbow and white 24-36h
C Color Zinc Tube Yellow rainbow 72-96h
D Olive green zinc Tube Olive green or bronze color 96-144h
E PVF Tube(Mainland) Black 1000h
PVF Tube(Abroad) 3000-5000h


Sorts of Surface Treatment
Electrolyte double wall steel tube with PVF coatedinc Plating + Chromate Yellow
Electrolyte double wall steel tube with PVF coatedinc Plating + Chromate Olive
Electrolyte double wall steel tube with PVF coatedinc Plating + Chroamte Olive + PVF Olive Green


 
 
 
 
 

  Shaanxi Yong Rui Ltd. was established in 1998, the company is located in Xi’an National Economic and Technological Development Zone Fengcheng 3; registered capital of 3 million RMB, fixed assets of 500 million, the existing staff of280, has college education of technical management staff of 20 people; business in September 2003 through the national ISO9001 quality management certification.

Packing
Coils or Bundles ,then in pallets or wooden boxes
Water-proof packing, using plastic film for inner package , and plastic woven bag for outside package
Delivery Time
Within 30 days(Order quantity is between 2 Metric Tons and 5 Metric Tons)
Other situation can be followed the negotiation by two parties
Export to USA/UK/AU/RU/IRI/MYA/SPAIN

1) we have more than 10 years export experience to Iran, American, Germany, India, Myanmar etc. pleae rest assure at our quality.
2) prompt shipment : By reputed shipping line and professional documents .
3) Cargos photo : before and after loading into container .
4) packing : new and strong seaworthy packing, also can based on buyer's special request .
5) Best service after shipment with Email .
6) feedback Email after endusers .
7) can provide free samples for you check the quality . the samples need about 3-4days .
8) on-time delivery : production delivery time need about 30-40days after get the deposit .

1.Are you a trading company and manufacturer?
Yes, we have have plant and trading company, we can deal business both, but do it as condition.

2.How can I get your prices?
Pls show us your target tube size (OD ,wall), material (steel grade),coating types( coating types on OD/ID both), in coil or straight length tube(if length, how long per pcs?), quantity, packing requirement ,application and specialy requirement. Then,we can send you an exact quotation within 24 hours.

3.What's your MOQ?
For common coating type and common size, MOQ is 3000kg ; for specially coatinf type or specialy size need confirmed.

4.How can I get some samples to do quality approved?
After quotation confirmed, we can send some samples for testing, severl pieces tube are free,but big quantity maybe charged and freight should be bear by client.

5.What about the leading time for mass order producing?
Usually, 15-25 days for material preparing and producing after order confirmed, and 10 days for shipment booking and confirmed.35 days min for common size and type, special size and type need confirm.

6.Could the tube be customized for us?
Sure, we are professional supplier.when we confirmed and accept all your target requirement,we can customize the tube as your target.

big coil pvf coated bundy tube

spiral pvf coated bundy tube

pvf coated bundy tube